Operation Hercules
We managed the relocation of a 2,300-tonne press from the old factory to the new one, with the necessity to get the machine back into production as quickly as possible. The entire operation was completed in one week, from the start of dismantling to start-up at the other factory. Everything was done by crane truck as neither factory was equipped with overhead cranes.